Yamaha Motor was spun off from the instrument maker Nippon Gakki in 1955 and began building motorcycles at Hamakita, near Hamamatsu. In the mid-1960s it was building up a new factory at Iwata, further east in Shizuoka prefecture. When Toyota needed a partner to build a small run of a high-performance grand tourer that its own mass-production lines could not handle, it signed a technical agreement with Yamaha, whose research staff had been working on sports-car prototypes. Toyota set the layout, styling and basic design of the 2000GT; Yamaha refined the engine and did the detailed body and chassis design, then handled prototyping and production.
Production of the 2000GT started at the new Iwata factory once its first construction phase was finished, with the first saleable car completed in February 1967. Sheet-metal work, welding, body assembly, engine assembly and painting were done by hand in a newly built No. 3 building at Iwata, while fibreglass parts came from Yamaha's Arai plant, wooden interior parts from Nippon Gakki and pressings from Kitagawa and outside panel shops. Each car was built individually, and the 2000GT was sold at a loss as a showcase for Toyota. Production ended in 1970 after 337 cars by the most-cited count.
Yamaha moved its headquarters to Shingai in Iwata in 1972, and the Iwata site has remained the company's head office and a motorcycle assembly works, with the Iwata Main Factory taking over engine assembly from the nearby Iwata South Factory in 2011. Yamaha went on to develop and build car engines for Toyota, Ford and Volvo, but the sources consulted do not say which of those engines were made at Iwata.
Opened
—
Still building
Today
- Status
- operating
- Models built
- 1
- Components
- 3
- Peak workforce
- Not documented
- Location
- 34.7228, 137.8789
- Also called
- Iwata Main Factory (Iwata Honsha Kōjō), Yamaha Motor headquarters, Shingai, Iwata
Cars built here
- 1967–1970Toyota 2000GT · 337Calendar years, May 1967 to August 1970 (ja Wikipedia: 337 including prototypes, excluding nine 2.3-litre MF12L cars). en Wikipedia, citing Toyota and Yamaha data, gives 233 MF10, 109 MF10L and nine MF12L built at Iwata. Yamaha says the first market-ready car was completed at the new Iwata Factory in February 1967.
Parts made here
- Toyota 2000GT bodies (sheet metal, welding, assembly, painting) · 1967–1970Done by hand in the newly built No. 3 building at Iwata (ja Wikipedia). FRP parts were made at Yamaha's Arai plant, interior wood panels by Nippon Gakki, and pressings by Kitagawa Jidosha Kogyo and Kuroyanagi Bankin.
- Toyota 3M twin-cam six-cylinder engine assembly (2000GT) · 1967–1970Engine assembly was done in the Iwata No. 3 building (ja Wikipedia). The engine was Toyota's Crown M-type six with a Yamaha-produced DOHC cylinder head (ja Wikipedia); Toyota's history describes it as Toyota's 3M engine with DOHC. Where the head itself was machined is not stated.
- Motorcycle enginesIn 2011 the Iwata South Factory engine assembly line was integrated into the Iwata Main Factory's motorcycle assembly line (Yamaha corporate timeline). Earlier and later details are not documented in sources opened.
Pictures
Milestones
- 1955
Yamaha Motor founded on 1 July, building motorcycles at Hamakita (not Iwata).
- 1965
Toyota–Yamaha agreement on sports-car technology signed 8 September (Yamaha); first 2000GT prototype completed in August; car shown at the Tokyo Motor Show in October.
- 1966
Yamaha-built 2000GT sets three world and 13 international speed records in October.
- 1967
First market-ready 2000GT completed at the new Iwata Factory in February; series production from May.
- 1969
2000GT facelift enters production in August.
- 1970
2000GT production ends (August per Wikipedia; October per ja Wikipedia's later-model dates).
- 1972
Yamaha Motor moves its headquarters to Shingai, Iwata, in February.
- 1984
Yamaha signs a contract to develop, produce and supply car engines to Ford.
- 2011
Iwata South Factory engine line integrated into the Iwata Main Factory motorcycle assembly line.
- 2014
Yamaha's cumulative automobile engine production passes 3 million.
- 2017
Yamaha Innovation Center opens at the Iwata headquarters.
Sources
- 1965-1967 Toyota 2000GT, from Trial Production to Manufacturing (Our Stories no. 12) — Yamaha Motor Co., Ltd.
- Corporate Timeline — Yamaha Motor Co., Ltd.
- Toyota 75 Years: Development of Sports Cars — Toyota Motor Corporation
- トヨタ・2000GT — Wikipedia (ja)
- ヤマハ発動機 — Wikipedia (ja)
- Toyota 2000GT — Wikipedia
- Yamaha Motor Company — Wikipedia
- Coordinates are ja Wikipedia's coordinates for Yamaha Motor's head office at Shingai, Iwata (34.72280556, 137.87894444). Sources say the 2000GT was built at Yamaha's 'new Iwata Factory' and in a newly built No. 3 building in Iwata, but none opened states that this was the same Shingai site that became headquarters in 1972. Treat the coordinates as the Iwata head-office site, not a confirmed 2000GT building.
- opened is null: Yamaha says only that phase one of the new Iwata Factory had been completed when 2000GT production began (first car February 1967). No source opened gives the factory's opening date.
- 2000GT count conflict: ja Wikipedia gives 337 built May 1967–August 1970 including prototypes, excluding nine MF12L cars; en Wikipedia gives 233 MF10 + 109 MF10L + 9 MF12L (351 in all) built at Iwata, and says Toyota reports all 337 regular cars sold. Neither Toyota's nor Yamaha's history page opened gives a number.
- Production end: en Wikipedia says August 1970; ja Wikipedia's production section says August 1970 but its facelift section says the later model was built from August 1969 to October 1970.
- Agreement date conflict: Yamaha gives 8 September 1965 for the technical agreement; ja Wikipedia says Toyota's team visited Yamaha and concluded a tie-up on 28 December 1964 and that joint development started in January 1965; ja Wikipedia's company timeline lists February 1966 for Yamaha's technical support.
- Engine credit: ja Wikipedia says Yamaha produced the DOHC head fitted to Toyota's M-type six; en Wikipedia says Yamaha converted the engine; Toyota's own history describes the 3M as Toyota's DOHC development of the M engine and does not mention Yamaha's part in the engine.
- Not tied to Iwata by any source opened, so not listed: Yamaha's later car-engine work for Toyota (cylinder heads such as 4A-GE, which en Wikipedia says were built at Toyota's 'Shimayama' (as spelled there) plant; 1G-GE, 3S-GE, 2ZZ-GE, 1LR-GUE and others), the Ford Taurus SHO V6/V8 and Zetec-SE engines, and the Volvo B8444S V8 (2005–2010). Yamaha says cumulative automobile engine output passed 3 million in 2014 without naming plants.
- Motorcycles: Yamaha's timeline shows a motorcycle assembly line at Iwata Main Factory in 2011, but no source opened names the motorcycle models assembled at Iwata or the years, so no motorcycle is listed under built.
- The Toyota 7 racing car was developed with Yamaha (ja and en Wikipedia), but where it was built is not stated, so it is not listed.
- Photos show the present-day Iwata head-office buildings; no openly licensed photograph of the 1960s factory or of 2000GT production at Iwata was found on Commons.
- Workforce is not documented in sources opened.